(1)代表性论文 [1] Ting Wang, Jing-Chun Feng. Multi-objective joint optimization for concurrent execution of design-construction tasks in DB mode[J]. Automation in Construction, 2023, 156: 105078. https://doi.org/10.1016/j.autcon.2023.105078. (SCI检索,中科院一区,IF=11.4) [2] Ting Wang, Jing-Chun Feng. Optimal Review Strategy for Concurrent Execution of Design–Construction Tasks in DB Mode[J]. Journal of Construction Engineering and Management, 2023, 149(1): 04022139. https://doi.org/ 10.1061/(ASCE)CO.1943-7862.0002408. ( SCI检索,中科院二区,IF=5.6) [3] Ting Wang, Jing-Chun Feng. Linking BIM Definition, BIM Capability Maturity, and Integrated Project Delivery in the AECO Industry: The Influences of BIM Diffusion and Moral Hazard [J]. Journal of Urban Planning and Development, 2022, 148(3): 04022025. https://doi.org/ 10.1061/(ASCE)UP.1943-5444.0000839. ( SSCI/SCI双检索,中科院三区,IF=2.5) [4] Ting Wang, Jing-Chun Feng. Modeling and optimization of concurrent execution process of coupled design-construction tasks under design-build mode [J]. Concurrent Engineering: Research and Applications, 2022, Vol. 30(4) 353–366. https://doi.org/ 10.1177/1063293X221117865. (SCI检索,中科院四区) [5]王婷,丰景春,陈永战,严华东.基于联合体双方异质性特征的EPC项目控制权配置模型研究[J/OL].运筹与管理:1-10[2023-01-28].http://kns.cnki.net/kcms/detail/34.1133.g3.20221024.1805.006.html. (国家自然科学基金委认定A类期刊, CDCD) [6]王婷,丰景春.EPC模式下设计-采购-施工任务并行执行的多目标联合优化模型——基于z标记的多参量灰色GERT网络[J].系统管理学报,2023,32(04):687-700. (国家自然科学基金委认定A类期刊, CSCD) [7]丰景春,王婷,王龙宝.基于建筑信息模型的协同建设项目多层次多阶段利益分配机制——设计采购施工模式情景下[J].科技管理研究,2021,41(20):194-203. (CSSCI扩展版) (2)主持或参与的科研项目 [1] 江苏省研究生科研与实践创新计划项目(项目编号:KYCX22_0686): 工程总承包模式下耦合型设计-施工任务并行执行进度管理研究. (主持); (3)教育经历 2019.09-2023.09 河海大学,商学院,博士 2016.09-2019.06 西安工业大学,建筑工程学院,硕士 2012.09-2016.06 重庆文理学院,土木工程学院,学士 (4)工作经历 2023.12—至今,三峡大学,水利与环境学院,讲师 |